Engineering resources

Documents for compressor review.

Start with the published product-family information, then request project-specific selection and integration documents.

Resource library

Available technical resources.

Every item states what it is. A web summary is not presented as a controlled datasheet or model-specific test report.

Magnetic-bearing compressor portfolio

Catalog-based family summary

Web summary

Public now

Public

Open resource

Data-center chiller OEM inputs

Application guide

Web guide

Public now

Public

Open resource

OEM integration checklist

Engineering guide

Web guide

Public now

Public

Open resource

Technical source and claims policy

Evidence policy

Web policy

Public now

Public

Open resource

Technical guides

Written from the published fields.

Each guide states the catalog documents it works from and introduces no value those documents do not carry.

Selection and integration

The six inputs that decide a compressor selection

What an OEM settles before a centrifugal compressor can be selected: duty point, operating envelope, refrigerant, electrical supply and controls.

Read the guide

Installation and protection

IP54 on the compressor, IP00 on the drive — what that gap means

The compressors publish IP54, the high-power VFD table IP00. What each rating covers, what it does not, and what the gap asks of the installer.

Read the guide

Architecture and control

Two-stage compression and what a 10-100% range really tells you

The S, T and H families publish two-stage architectures and 10-100% capacity regulation. What that range is, what it is not, and why part-load hours decide.

Read the guide

Electrical and drive

Why a drive-fed compressor changes the starting-current conversation

The catalog publishes a permanent-magnet motor, a 2 A starting-current field and a 380 VAC VFD input. What those settle, and what has to be asked for.

Read the guide

Selection and integration

What the R134a catalog entry decides, and what it leaves to your programme

The S, T and H families publish R134a. What that means for a platform being designed now, and why a refrigerant change is development, not substitution.

Read the guide

Project documents by request

Project-specific documents.

Availability and release conditions are confirmed against the selected model and project stage.

Request sequence

  1. Submit an application brief with defined scope.
  2. ChillerRotor confirms model availability.
  3. Project-specific documents are prepared.
  4. Documents are released for the defined project.

Controlled document boundary

Documents prepared by request are project-specific and not published as public web content.

  • Scope-limited to the defined application
  • Not a public summary
  • Not a controlled datasheet
  • Not a model-specific test report
Discuss an OEM Application

Discuss an OEM application

WhatsApp · +1 573 353 4518sales@chillerrotor.com

or send the duty point

Add company and product family